My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-02-24_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:00 PM
Creation date
3/5/2010 3:46:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/24/2010
Doc Name
Complete Text Submittal - 2.05, Vol III Tab 1
Type & Sequence
PR12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />During the construction of the parking area for the office and the nearby slide <br />repair, performed late 1998, approximately 4,200 cubic yards were salvaged. <br />Additionally, an estimated 20,100 cubic yards was salvaged from the <br />disturbance associated with the downhill conveyor project. Afterthe downhill <br />conveyor project was complete, the following topsoil is projected to be <br />available for reclamation. <br />During the construction of the B -Seam portals and the preparation plant <br />approximately 43,000 cubic yards were salvaged. The available topsoil for <br />reclamation is as follows: <br />Pile A (CY) <br />Pile D <br />Piles A - C <br />Parking <br />Slide <br />Conveyor <br />B -Seam & <br />Prep Plant <br />Total <br />Quantity (CY) <br />87,600 <br />4,200 <br />20,100 <br />43,000 <br />154,900 <br />The 5,300 cubic yards of topsoil salvaged during the construction of Pond C <br />and the gob pile is stored in topsoil stockpiles D and E. An addition 800 <br />cubic yards of topsoil was added to topsoil stockpile E during the expansion <br />of the coverfill pile during 2003. <br />A total of 56,800 cubic yards of topsoil was stripped and stockpiled during <br />the construction of the unit train loadout. This quantity results in an average <br />1.1 foot replacement depth within the disturbed area at the loadout including <br />the disturbance associated with Ponds J & K. The topsoil is stored in topsoil <br />stockpile F. Construction of Gob Pile No. 3 will result in approximately <br />70,000 CY of topsoil that will be stored in Topsoil Stockpile F -1. <br />The design of the gob pile in 2003 was a 10 -year design. At the time of <br />this writing, in May 2006, the gob pile is nearly full and ready to be <br />reclaimed. To reclaim the entire gob pile, approximately 1.0 feet of topsoil <br />will be placed on the completed construction face. In total, the operator <br />salvaged approximately 50,000 CY of topsoil. Material from the stockpile, <br />new borrow area and the topsoil stockpile will be utilized for reclamation. <br />PR -12 2.05-52- 2/10 <br />Pile D <br />Pile E <br />Grand Total <br />Quantity (CY) <br />4,500 <br />1,600 <br />1 161,000 <br />A total of 56,800 cubic yards of topsoil was stripped and stockpiled during <br />the construction of the unit train loadout. This quantity results in an average <br />1.1 foot replacement depth within the disturbed area at the loadout including <br />the disturbance associated with Ponds J & K. The topsoil is stored in topsoil <br />stockpile F. Construction of Gob Pile No. 3 will result in approximately <br />70,000 CY of topsoil that will be stored in Topsoil Stockpile F -1. <br />The design of the gob pile in 2003 was a 10 -year design. At the time of <br />this writing, in May 2006, the gob pile is nearly full and ready to be <br />reclaimed. To reclaim the entire gob pile, approximately 1.0 feet of topsoil <br />will be placed on the completed construction face. In total, the operator <br />salvaged approximately 50,000 CY of topsoil. Material from the stockpile, <br />new borrow area and the topsoil stockpile will be utilized for reclamation. <br />PR -12 2.05-52- 2/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.