My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 3/5/2010, 7:14:17 AM-JWD
DRMS
>
Public
>
REVISION - 3/5/2010, 7:14:17 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:18 PM
Creation date
3/5/2010 7:21:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
3/3/2010
Doc Name
Bond Adjustments
From
Powertech (USA) Inc.
To
DRMS
Type & Sequence
SR2
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Sorenson, DRMS <br />Bond Reduction <br />March 2, 2010 <br />NOI File No. P-2008-043: <br />2 <br />For NOI File No. P-2008-043, Powertech is proposing that the DRMS release a portion of the <br />financial warranty bond (direct and indirect costs) associated with the advancement, <br />abandonment, and surface reclamation of the 5 exploration boreholes for the following activities. <br />• Plugging and abandonment of the 5 exploration boreholes advanced. <br />• Backfilling mud pits and replacement of topsoil. <br />• Equipment travel between mud pits. <br />• Grading and seeding (where applicable) of mud pits and drilling pads. <br />Powertech also seeks full release of the financial warranty bond (direct and indirect costs) <br />associated with the advancement, abandonment, and surface reclamation of the 3 remaining <br />exploration boreholes that were bonded but not utilized. <br />Additionally for NOI File No. P-2008-043, Powertech is proposing that the DRMS release a <br />portion of the financial warranty bond (direct and indirect costs) associated with the <br />advancement, completion, and surface reclamation of the 1 groundwater monitoring well for the <br />following activities. <br />• Plugging of the annular space volume of drill hole used to construct 1 groundwater well. <br />• Backfilling mud pit and replacement of topsoil. <br />• Equipment travel. <br />• Grading and seeding of mud pit and drilling pad. <br />One of the groundwater wells approved and bonded for under the P-2008-043 NOI (Well C-004- <br />35) has not yet been advanced and constructed. Powertech would like the financial warranty <br />bond to remain in place for the construction of this groundwater well. <br />NOI File No. P-2008-043 MD-01: <br />For NOI File No. P-2008-043 MD-01, Powertech is proposing that the DRMS release a portion <br />of the financial warranty bond (direct and indirect costs) associated with the advancement, <br />abandonment or construction, and surface reclamation for the following activities. <br />• Plugging and abandonment of the 1 exploration borehole. <br />• Plugging of the annular space volume of drill holes used to construct the 15 groundwater <br />wells. <br />• Backfilling mud pits and replacement of topsoil. <br />• Equipment travel between mud pits. <br />• Grading of mud pits and drilling pads. <br />Financial warranty bond will need to remain in place for re-seeding all groundwater well <br />locations approved under the P-2008-043 MD-01 NOI. Re-seeding of the groundwater <br />monitoring well locations will take place in April, 2010. The 1 exploration borehole approved <br />under the P-2008-043 MD-01 NOI is located in a cultivated field, and Powertech requests full <br />release of bond for that activity.
The URL can be used to link to this page
Your browser does not support the video tag.