Laserfiche WebLink
(Page 4) <br />3. Topsoil has not been salvaged at the Gaede Pit as specified in the Mining and 3 / 19 /10 <br />Reclamation Plans. The Operator has failed to remove and segregate topsoil as required <br />by Rule 3.1.9(1). <br />PB or PV: _PR <br />TOPIC(S): IS <br />Corrective actions are to: The Operator shall revise the Mining and Reclamation Plans <br />through a Technical Revision. The Technical Revision shall provide a detailed plan describing <br />how topsoil will replaced upon reclamation of the Gaede Pit. If topsoil is to be imported, the <br />Operator shall comply with the requirements of Rule 3.1.5(9). The Technical Revision shall be <br />submitted to the Division on or before March 19, 2010.