My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-01_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-03-01_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
3/2/2010 7:28:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/1/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: 02/07/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth 8 Environmental <br />G) Material Processing <br />1) East Cresson Clay Borrow Area <br />Mobilization and set up of the soil liner fill processing plant was completed this week. <br />Processing of Soil Liner Fill material began this week. A CAT D-8 dozer, a CAT 320 excavator, a <br />CAT 966 front-end loader, and tandem-axel haul trucks were used to excavate, haul, and process <br />the material. <br />Location This Week <br />tons Cumulative Comments <br />E Cresson Clay Processing 5,388 5,388 <br />S Cresson Clay Processing 0 201,199 Processing in area complete. <br />Squaw Gulch Processing 0 35,816 Processing in area complete <br />Total 5,388 230,404 <br />2) Low Volume Solution Collection Fill Material (LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D-10 dozer and a skid steer loader were used to process the material. <br /> This Week Cumulative <br />Location Comments <br /> (tons) (tons) <br />Dump 4 LVSCF Processing 24,421 101,248 <br />H) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />Excavation for the investigation of a possible Underground Working at UG#3011 was performed <br />using a CAT 375 excavator. The area was excavated down to 25 feet below finish grade and no <br />working or voids were encountered. John Lupo, P.E. Project Sponsor, stated that there is no <br />historic evidence of a working in the area. The excavated area will be backfilled as structural fill <br />placement progresses, through this area. No additional remediation is required for this working. <br />Confirmatory drilling was performed for Underground Working #3012. A drill pattern was set out <br />by an AMEC field representative. Fourteen holes were drilled encountering three voids. An <br />approximate total of 700 feet was drilled. An AMEC representative observed the confirmatory <br />drilling constantly. It will be necessary to remediate the lower portion of the working before any <br />further drilling can be performed to the east. Temporary fill material will need to be placed over <br />the working to gain access to the east side of the working. The crown pillar will be collapsed by <br />blasting and excavated. The working will then be remediated per plan. Prior to any remediation all <br />Temporary fill will be removed <br />Confirmatory drilling was performed for Underground Working #3013. A drill pattern was set out <br />by an AMEC field representative. Thirty-five holes were drilled encountering no voids. An <br />VLF Weekly Report WE 02.13.10.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.