Laserfiche WebLink
II' <br /> RP2/3 Pond —RP-4 Pond <br /> Processing Waste <br /> Refuse piles 2/3/4 and 5 were snow covered at the time of the inspection. Coal processing waste <br /> was being stockpiled on RP-5 at the time of the inspection. The refuse piles were stable and <br /> compacted at the time of the inspection with no problems noted. <br /> I <br /> i <br /> Support Facilities <br /> Surface facilities in and around the office and maintenance facilities area appeared to be in <br /> compliance with no problems noted. <br /> The areas in and around the railroad loadout, conveyor corridor, and vent shaft-1 were snow covered <br /> and stable at the time of the inspection. <br /> The slopes of the Slot Storage area were snow covered and stable with no evidence of erosion of <br /> damage noted. <br />