My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-25_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-02-25_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:00:09 PM
Creation date
2/26/2010 12:30:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
2/25/2010
Doc Name
2nd Response to Technical Adequacy
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR82
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. On Page 2.05-47 Colowyo proposes to provide a specific plan for the following <br />year's reclamation in the preceding year's Annual Reclamation Report (for <br />example, the specific details of the 2010 reclamation would be contained in the <br />2009 Annual Reclamation Report). The Division does not agree with this <br />approach. The purpose of the Annual Reclamation Report, as stated in Rule <br />2.04.13, is to document reclamation activities for the previous year. The Annual <br />Reclamation Report is not intended as a means to propose plans for future <br />reclamation. Future reclamation plans must be addressed as a revision to the <br />permit. <br />A detailed topsoil redistribution plan for the upcoming year must be submitted as <br />a Minor Revision to the permit, prior to topsoil replacement. This revision will <br />provide details for a specific reclamation block(s) within the framework of the <br />approved topsoil replacement plan. A map or plate showing the proposed plan for <br />each year's reclamation block(s) will be included in the revision. This map or <br />plate will need to be a zoomed view of the reclamation block(s) so enough detail <br />can be shown. The scale of Map 5A is too large to provide this level of detail. <br />The proposed topsoil replacement plan revision will contain a map showing the <br />location of the topsoil replacement, and a description of the depth of topsoil that <br />will be replaced (the replacement zones, as discussed in question 1 above). These <br />annual plans may be included in a new appendix titled "Annual Topsoil <br />Replacement Plan". If major changes are proposed to the topsoil replacement <br />plan, a Technical Revision will be required. Please add this commitment, where <br />appropriate, to the narrative on Pages 2.05-46 through 2.05-50. <br />Colowyo's Response: <br />As discussed, Colowyo has removed this statement from the text and will continue to <br />utilize the revision process for major departures from the currently approved plan. <br />8. On the top of Page 2.05-48 Colowyo states that "...topsoil will be left in a rough <br />condition..." Please provide additional detail regarding the methods that will be <br />used to ensure that the topsoil is either left in a roughened state or roughened prior <br />to seeding. This practice is especially important in light of the fact that scrapers <br />are used for topsoil replacement at the Colowyo Mine, since scrapers contribute a <br />great deal of compaction to the topsoil. <br />Colotiwo's Response: <br />As discussed, Colowyo has provided additional detail in the text. <br />9. Although variable topsoil replacement for the West Pit and South Taylor Pit is the <br />primary focus of TR-82, there is no mention of the topsoil replacement activities <br />in the East Pit, the Gossard Loadout or the facilities area. It is assumed that since <br />these areas are not specifically mentioned in the text that the topsoil in these areas
The URL can be used to link to this page
Your browser does not support the video tag.