Laserfiche WebLink
4i- <br />Appendix A - DRMS Form 2 Public <br />GeoLynx LLC Crampton Project 2010 NOI <br />Drilling Information <br />Five holes are proposed for the claim block. Approximate GPS coordinates (UTM NAD83 Zone <br />12) and hole particulars are shown in Table 1. The holes will mainly be within the Oligocene <br />Tallahassee Creek Conglomerate formation in the project area. <br />Table 1 : Pro posed Drill Hole Loca tion Partic ulars <br />Drillhole UTM Planned Planned Inclination Declination <br /> Zone Easting Northing (dip) (bearing) Depth m/Ft <br />GL-PDH-A 13S Confidential Confidential -90 91/300 <br />GL -PDH-B 13S Confidential !Confidential 90 106/350 <br />GL -PDH-C 13S Confidential Confidential -90 122/400 <br />GL -PDH-D 13S Confidential Confidential -90 106/350 <br />GL -PDH-E 13S Confidential Confidential -90 106/350 <br />Total 5 holes 533/1750 <br />Drilling will be done by a truck-mounted rotary rig capable of drilling from 1,000 feet to 1,500 <br />feet or so, such as a Gardner-Denver 1500 or equivalent. Hole diameter will be in the 5"to <br />6"range, and cuttings will be removed by airlift. Although considered unlikely, a nominal 1,000 <br />gal to 2000 gal water truck will be available if water is needed to make an air/foam mixture. If <br />an air foam mixture is needed, then the foaming agent will be an environmentally benign, non- <br />hazardous and non-toxic product such as Quik-FoamTM or equivalent. <br />Cuttings will be directed into the containment pits at each site and mineralized cuttings will be <br />segregated within the pit. <br />Probing will be accomplished with a truck-mounted probe or portable unit possessing gamma <br />and electric logging tools. No tool with a radioactive source will be used. Water from the water <br />truck may be added to the hole to improve the down hole electrical characteristics. <br />Surface Disturbance <br />No roads will be constructed. Approximately 1500 feet of existing roads designated by BLM as <br />"closed" will be utilized to access the site. BLM has requested that the existing roads designated <br />as "closed" be included in the reclamation plan. To access these roads, several boulders will be <br />moved utilizing appropriate equipment and then replaced after completion of the project. No <br />additional disturbance to these roads is anticipated, but upon completion of the project these <br />roads will be broadcast seeded. The only surface disturbance anticipated will be the excavation <br />of five nominal 10 foot x 10 foot by 3 foot deep containment pits for cuttings and, if needed, air- <br />Page 2 of 6