Laserfiche WebLink
RULE 2 PERMITS <br />• Other surface treatments are also described in Volume I, section 2.05.4. A list of the equipment used by <br />Colowyo in order to perform the day-to-day operation of coal mining is shown in Volume 1, Table 4, <br />Equipment List and in Table 2.05.2-1. <br />2.05.3 (2) Operation Description <br />A detailed narrative description of the land to be affected within the South Taylor area is provided' above <br />under the heading Production Methods and Equipment. The mining plan for South Taylor is graphically <br />portrayed on the Mine Plan Map (Map 23A). The various acreages to be affected by the planned mine <br />operation aze shown in Volume 1, Section 2.03 on Table 1, Affected Areas for Mining and Reclamation. <br />The details ofthese operations for South Taylor are shown on the Mining Range Diagram (Map 24A). <br />The lines on Map 23A refer to coal seam mining, the lines on Map 28B, Topsoil Handling, refer to the <br />anticipated overall disturbance that not only includes coal mining, but also associated perimeter <br />disturbances as well. <br />2.05.3 (3) Mine Facilities <br />The existing buildings, structures, utility corridors and other facilities are shown on the Existing <br />Structures -North Map (Map 21), Existing Structures -South Area (Map 22) and Existing Structures <br />South Taylor Area (Map 22A). Colowyo only anticipates the need for a minimal amount of major <br />structures within the South Taylor area, which will include the installation of utility lines, water lines and <br />in-pit haulage routes. No out of pit haul roads are anticipated. All other support facilities are located on <br />maps 21 and 22, which will continue to be used for the life of mine. <br />• Please refer to Volume 1, Section 2.05 for a complete description of Operational procedures within the <br />permit boundary including the South Taylor area. <br />Power Lines <br />Because Colowyo utilizes many electric-powered mining machines, a network of electric power lines is <br />located in the permit azea to supply electricity to the equipment. The locations of the Colowyo power <br />lines are shown on the Existing Structures maps (Map 22A and Map 22B). <br />Electrical power lines located in the permit area will be constructed in accordance with requirement of <br />Section 4.18 to minimize potential electrical hazards to large raptors. <br />The major pieces of equipment that are powered by electricity and will be used in the South Taylor area <br />are draglines, shovels and the highwall miner. Therefore, during the life of the mine it is necessary to <br />periodically move the existing power line loop to accommodate the advancement of the pit. <br />Along the western limits of the South Taylor pit operations, highwall mining activities will be conducted <br />to extract coal that would otherwise be deem non-recoverable under existing operational procedures and <br />economic conditions. See Map 23A for the location of the area to be mined. <br />• <br />South Taylor/Lower Wilson -Rule 2, Page 96 ReviSlOn Date: 3/30/07 <br />Revision No.: PR-02 <br />