Laserfiche WebLink
of the waste rock pile to direct any potential run-off from the waste rock to a sediment pond <br />constructed in the low lying area north of the office trailer. <br />A ditch and/or slight berm will be constructed on the up-gradient side of the ore haul road from <br />the portal to the temporary ore stock pile site for drainage control. This will direct all flows from <br />the ore stockpile back into the mine for total containment. <br />Last Chance Mine - April 2009 <br />D-5