Laserfiche WebLink
These boreholes will be drilled on parts of the Last Chance #1 and #2, and Bull Durham claims. <br />The estimated reclamation liability is $11,720 which will be posted prior to beginning the <br />drilling program. <br />Phases 2 and 3 are interchangeable in the order to be drilled with reclamation liability increases <br />of $4700.00 and $4800.00 respectively. Bonds will be posted prior to starting drilling in these <br />areas. Phase 2 includes 86 holes (nos. 273 to 358) to be drilled on the Bull Durham and Pam <br />claims with a disturbed area of about 1.2 acres. Phase 3 includes 90 boreholes (nos. 1 to 90) to <br />be drilled on the northern parts of Last Chance claims 2 and 3. <br />Note that the number of boreholes to be drilled according to this exploration plan is a maximum <br />with fewer anticipated based on results. Also the locations plotted on maps are approximate to <br />be determined in the field based upon surface conditions and vegetation; i.e. holes may be moved <br />somewhat to avoid disturbing vegetation where possible. Actual locations will be surveyed <br />subsequent to drilling. <br />4. Re-seeding of Disturbed Areas <br />As previously described, exploration drilling and mining will be all on existing disturbances. <br />Minor additional acreage will be disturbed as access roads are widened and ditches cut or berms <br />constructed on uphill side for surface drainage control. <br />Table E-1. Proposed Surface Disturbance. <br />Area Description Previously Disturbed s ft Total Disturbed Areas ft <br />Waste Rock Dump 13,213 13,213 <br />Future Waste Rock Dump 0 16,588 <br />Ore Stockpile Area 941 941 <br />Sediment Pond North 649 649 <br />Sediment Pond South 412 412 <br />To Soil Stockpile 1,901 1,901 <br />Future Soil Stockpile 0 3,212 <br />General Facilities Area (includes <br />all of the above facilities) 53,737 107,271 <br />Mine Access Road 2,056 2,056 <br />Trail to Vent 1 3000 7130 <br />Trail to Vent 2 3000 3780 <br />Potential Vents A-C 0 12,300 <br />Drilling Phase 1* 0 108,900 <br />- <br />-Drilling Phase 2 0 51,600 <br />Drilling Phase 3 0 51,600 <br />- <br />Total 61,793 347,237 <br />Last Chance Mine - April 2009 E-2