Laserfiche WebLink
Al? r ?6Z <br />r /J?- tlt'' I <br />L.'A?KEwOOD <br />BRICK & TILE COMPANY <br />Since 1930 <br />Phone: (303) 238-5313 r' fax: <br />(303) 237-7737 <br />1325 Jay Street <br />Lakewood,. Colorado 80214 <br />Mr. Tony Waldron RECEIVED <br />Division of Reclamation, Mining & Safety ?FEB 1 NAB <br />Minerals Section <br />13 Sherman Street, Suite 215 sefew <br />13 <br />Denver, Colorado 80203-2273 1110 <br />Dear Mr. Waldron: <br />Re: Lakewood Brick and Tile Co. - Church Pit, Annual Report <br />MLRB Permit # M-1979-0,1'R, Anniversary Date 2/28/10 <br />This annual report addresses mining of both material being removed from the site. Each is <br />mined by a different operator under this single permit. This pit HAS NOT been granted a Temporary <br />Cessation and it HAS operated more than 180 days this year. The approved bond amount is $84,200 <br />covering 75.74 acres t, and the facility has seven mining and reclamation phases. Please refer to the <br />attached 2009-2010 Annual Report Map for the areas discussed in this text. Bestway Concrete is the <br />gravel miner at this mine having taken over for Hall-Irwin in January 2009 <br />We will deal specifically with the Annual Report requirements as outlined in Rule 1.15 of the <br />Rules and Regulations and those noted in the annual letter. <br />(1) Clay - We continued to mine deeper on the land previously disturbed north of the ditches in <br />Stage H (blue). Approximately 35.43 acres is disturbed by the clay operation in Stages O, I <br />and H. This included the old clay mined area south of the ditches shown as the Clay Plant <br />Site area (purple). <br />Gravel - A total of 12.75 acres is being used as plant site area in Stage A (orange). Approximately <br />1.00 acres of Pre-Law Overburden areas were processed this year. These areas have <br />been graded and are used for storing processed materials. The gravel operation has disturbed <br />28.42 acres f in the mine (\\\). Gravel was stripped from approximately 1.87 acres on the east <br />side of the active clay mining area Stages I & U. Most of the material processed at the plant <br />site came from gravel mined this year on the Rocky Flats Pit. Some waste rock was removed <br />for use by the mineral owners from the pre-law stockpile areas. <br />(2) No reclamation was required this year. The Pre-law stockpile areas that were disturbed have <br />been graded so only resoiling and seeding will be needed when it is time for those areas to be <br />seeded. Stockpiles of growth medium are located along the west and south sides of the permit <br />area. <br /> <br />(3) Clay - Mining will continue in Stage I or Stage U. No new area will be disturbed this year as <br />we continue to mine the area stripped in previous years. We will continue to mine deeper into the clay <br />veins exposed in the past and advance the face to the north as. Processing will