Laserfiche WebLink
General Mine Plan Compliance <br /> The Molly Brown dragline was working in the Q Seam on the K-Ridge pit. The trucktloader is also <br /> working at the east end of the K-Ridge pit. No problems were noted. <br /> Air Resource Protection <br /> A small amount of fugitive dust was observed from the LOM haul road traffic. Water trucks were <br /> deployed during the inspection and applied to control the dust. No dust was being emitted at the <br /> conclusion of the inspection. <br /> Excess Spoil and Development Waste <br /> Spoil continues to be placed in the Horse Gulch Fill in lifts. The benches are being cleared of snow <br /> and ripped to ensure infiltration to the underdrain system as permitted. No problems were noted with <br /> the Horse Gulch Fill at the time of the inspection. <br /> r+ <br /> Horse Gulch Fill Bench Horse Gulch Fill _ <br />