My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-20_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2008-03-20_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:25:34 PM
Creation date
2/11/2010 2:51:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
3/20/2008
Doc Name
Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C-1996-083 <br />PROJECT IDENTIFICATION <br />Date : 21-Feb-08 <br />User: JRS <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 53 <br />Task Task Description <br />261 Plug and Seal Boreholes HC-08-01 and HC-08-02 <br />262 Regrade Drill Pads <br />263 Regrade Light-Use Road <br />264 Replace Topsoil from Stockpile to Drill Pads <br />265 Replace Topsoil from Stockpile Light-Use Road <br />266 Reseed Drill Pads <br />267 Reseed Light-Use Road <br />268 Remove Water Line in Hubbard Creek <br />Direct Cost Total <br />INDIRECT COSTS <br />Overhead and Profit <br />Liability Insurance (1.55% of Direct Costs) <br />Performance Bond (1.05% of Direct Costs) <br />Job Superintendent (at $41.25/hour) <br />Profit (10.00% of Direct Costs) <br />Total Overhead and Profit <br />Contract Amount (Direct Costs + Overhead and Profit) <br />Technical Revision 53 <br />Permit C-1996-083 (Site. Bowie No. 2 Mine <br />_ <br />State : Colorado <br />Filename: C083-260 County: Delta <br />i <br />TASK HOURS DIRECT COST <br />i <br />8.001 <br />$2,727 <br />3.15, $653 <br />7.371 <br />$1,529 <br />1.36; <br />$283 <br />1.80; $373 <br />0.68' $465 <br />0.90! $616 <br />16.00 $2,501 <br />39.26 <br />! <br />i $9,147 <br />i $142 <br />i $96 <br />19.63 $810 <br />$915 <br />I <br />$1,962 <br />$11,109 <br />Legal - Engineering _ PrQL" Management <br />Engineering Work and Contract/Bid Preparation (4.25%ofContract <br />) <br />Reclamation Management and Administration (3.25% of Contract) <br />TOTAL BOND AMOUNT <br />Irs <br />$4721 <br />$361 <br />S11 <br />rage 1 <br />2I2V2008
The URL can be used to link to this page
Your browser does not support the video tag.