My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 2/11/2010, 1:20:54 PM-MR1
DRMS
>
Public
>
PERMIT FILE - 2/11/2010, 1:20:54 PM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:25 PM
Creation date
2/11/2010 1:23:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009038
IBM Index Class Name
PERMIT FILE
Doc Date
2/11/2010
Doc Name
Response to adequacy letter dated 01/12/10 (non-confidential)
From
Mount Sneffels Mining Company, LLC
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2- Public) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approxmiate topsoil redistribution depth: <br />Very little topsoil is present at any of the drill sites, <br />Most of the sites are located in talus fields composed of varyina <br />sizes o roc Some fines o exist. All fines an topsoil will <br />.. ed and stockpiled during road and sibe buildirig. e <br />materials will then be used to better revegetate the disturb d <br />areas. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drill holes at Gi tp 1 ;(-hrii a will not bep lugged as theTare w? thin <br />the permit boundary of the Ruby Trust Mine. All other drill holes <br />will be plugged from first solid rock encounter to total depth. <br />will fill from first solid rock to the curfarP- <br />Cement will hp risen to plug all b-0--les, <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Roads and drill sites will he re contoured to the original <br />topography. Any previously stockpiled fines and/or topsoil will <br />then be placed to enhance revegetation. Larger rock wi en be <br />scatt;exed over the dirsturbed areas. Reseeding will then be <br />undertaken. <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Same as item 5.
The URL can be used to link to this page
Your browser does not support the video tag.