My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-11_REVISION - M2000158 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000158
>
2010-02-11_REVISION - M2000158 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:06 PM
Creation date
2/11/2010 1:12:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
REVISION
Doc Date
2/11/2010
Doc Name
Submittal
From
Platte Sand and Gravel, LLC
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall, if directed by the Owner/Engineer, employ one or more of the <br />following techniques to satisfy the hydraulic conductivity criterion: <br />A. Use a higher percentage of clay and silt materials in the backfill by separating <br />and spoiling the excavated sandy layers. <br />B. Add dry bentonite, up to 3.5 percent by dry weight, to the backfill. Bentonite shall <br />be spread over 6 to 8 inch thick layers of soil backfill material and mixed <br />thoroughly. <br />C. Add more bentonite to the slurry mixture. <br />D. Use material from an approved off-site area with a high percentage of clay and/or <br />silt in the backfill by importing material. <br />3. Stockpiled material from excavation and off-site materials for slurry wall backfill shall be <br />thoroughly mixed and blended into a homogeneous mass, free from large lumps or <br />pockets of fines, sand, or gravel, by windrowing, disk harrowing, bulldozing, blading, or by <br />other methods such as a pug mill, as approved by the Owner/Engineer. <br />4. Slurry may be sluiced into the backfill mixture during blending operations to obtain the <br />required consistency and slump. Sluicing with water will not be permitted. <br />5. Excess slurry that may drain away from the mixing operations shall be allowed to drain <br />back into the trench or shall be collected if mixing is done at a remote location. In no case <br />should excess slurry flow outside of the construction limits. <br />6. The Contractor may be required to add dry bentonite to the backfill material by <br />broadcasting, pug mill or other methods approved by the Owner/Engineer to achieve the <br />desired hydraulic conductivity value. <br />7. If the backfill material is mixed adjacent to the trench, the Contractor shall construct a <br />small dike (0.5-1 foot high) parallel to the slurry trench, if required by the Owner/Engineer, <br />in order to keep the backfill from flowing uncontrolled into the trenches as a result of wave <br />action created by the dozer mixing the backfill. Intermittent openings in the dike will be <br />allowed so that excess slurry may flow back into the trenches. <br />8. The Contractor shall mix backfill at a remote mixing area if conditions are not acceptable <br />to the Owner/Engineer along side of the trench. <br />9. No mixing of backfill material shall be performed when the air temperature is continuous <br />below 25 degrees Fahrenheit unless otherwise approved by the Owner/Engineer. <br />10. Mix only the quantity of backfill that is needed to construct the wall. <br />B. Placing <br />1. The backfill mixture shall be in compliance with the backfill requirements, immediately <br />prior to introduction into the trench. <br />2. The backfill shall be placed so that no pockets of slurry are present in the completed <br />slurry wall. The backfill shall not be deposited in any manner that will cause segregation. <br />Dropping of backfill material into the slurry will not be permitted. <br />3. The Contractor shall backfill continuously in the direction of the excavation from the <br />beginning of the trench to the end of the trench, unless approved by the Owner/Engineer. <br />4. If a lead-in trench is not excavated, the initial backfill shall be placed by lowering the <br />material to the bottom of the trench by means of a clamshell bucket or other approved <br />equipment until the backfill emerges from below the slurry surface and achieves its natural <br />angle of repose from the bottom of the trench to the surface. <br />5. Placing operations shall proceed in such fashion that the top of the backfill below the <br />surface of the slurry shall follow a reasonably uniform grade and shall not have hollows <br />that may trap pockets of slurry during subsequent backfilling. The bulldozer operator shall <br />pile sufficient backfill on the edge of the existing backfill to cause the backfill to enter the <br />trench by sliding down the forward face of the previously placed backfill. <br />6. The toe of the backfill slope shall not be less than 30 feet following the toe of the <br />excavation to permit proper cleaning.