Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2009 <br />Eagle Mine Complex C 81-044 BTU Empire Corporation <br />mine name permit # Perm ittee <br />Address: 29515 RCR #27 Oak Creek. Colorado 80467 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation <br />monitoring data as required by the approved permit. The location of the acreage reported under each land status <br />category and year of seeding (if applicable) should be clearly and accurately identified on a map included with the <br />report. <br /> <br />Land Status Category Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total i <br />Acres disturbed 422.0 0 422.0 <br />Acres backfilled and graded 0 0 0 <br />Acres topsoiled 0 0 0 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for each <br />catennrv helow_ no not include acres that have achieved final- Phase III release. <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 years or Greater than <br /> Total year Total' less 10 ears' <br />Acres seeded* 271.4 17.1 288.5 29.7 258.8 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 442.0 and the total number of acres: <br />Phase I released 20.0 Phase II released 20.0 Phase III released 20.0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 133.5 <br />Acreage in active mining areas N/A <br />'(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded