My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-05_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2010-02-05_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:22 PM
Creation date
2/9/2010 1:26:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
2/5/2010
Doc Name
Preliminary adequacy rebview
From
Daub & Associates, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAUB & ASSOCIATES, INC. <br />February 3, 2010 <br />Mr. Travis Marshall / <br />Colorado Division of Reclamation, Mining and Safety// <br />101 South 3rd, Suite 301 <br />Grand Junction, CO 81501 <br />19851/ SOUTH BROADWAY <br />GRAND JUNCTION, CO 81507-9649 <br />(970) 254-1224 <br />FAX (970) 242-8438 <br />email: gjdaub@daubandassociates.com <br />www.daubandassociates.com <br /> <br />FEB 0 6 2610 <br />GRAND ,EUWj, ( i V tafj OFFICE <br />REMM7*114 M & SAFME <br />Subject: Preliminary Adequacy Review ? ECNV <br />Natural Soda, Inc. FEB <br />1) 9 <br />2010-26-198 Appraisal Core Holes? 2010 <br />®ivi )on o Feciamation <br />Section 26, TIS, R98W, 6th PM, Rio Blanco County Mining and Safety <br />Dear Mr. Marshall: <br />Natural Soda, Inc. (NSI) received your letter regarding the adequacy of our submitted <br />technical revision. Included in this response are clarifications of the noted issues. <br />1: The access road disturbance was briefly noted in the Technical Revision's, <br />attached Table 1. Daub and Associates, Inc. (D&A) calculated an access surface <br />disturbance to be approximately 2.29 acres (see Table 1 on page 3 of this letter for <br />calculations). NSI will only be drilling four of the seven proposed holes, <br />therefore not all of the proposed accesses will be needed. The actual surface <br />disturbance (-1.35 acres) at-project completion should be substantially less than <br />calculated total (2.29 acres). <br />2: The purpose of NSI's coring project is to further define the nahcolite/halite <br />facies beneath their lease. The future use of each core hole and completion <br />construction will be dependent on the amount of nahcolite in the Boies Bed <br />observed in the core in the field from each hole. Flexibility in the drilling order is <br />therefore required for the success of this drilling and well completion program. <br />3: Four aquifers (Uinta, A-Groove, B-Groove, and Dissolution Surface) will be <br />penetrated. All well locations are located down gradient of any active mining. <br />During coring, the aquifers will be protected by a temporary steel liner installed to <br />SPECIALIZING IN PROFESSIONAL GEOLOGICAL, ENVIRONMENTAL, HYDROLOGICAL, GEOTECHNICAL AND PERMITTING SERVICES <br />Page 1 of 3
The URL can be used to link to this page
Your browser does not support the video tag.