Laserfiche WebLink
Table E51-8 <br /> <br /> <br />Underground Mine Water Balance -Future Years <br />Case 3- Some Eastern and Northern Inflow Diverted to 115 Sump <br />Water Year 1999 2001.1 2001.1 2002 2005 2010 2014 <br /> <br />115 -Fish Creek Units <br />WMD ro~ pm 55 55 55 55 55 55 55 <br /> umhos/cm 2900 2900 2900 2900 2900 2900 2900 <br />Water in Storage gallons 4.81E+08 2.10E+OS 2.10E+08 2.10E+08 2.10E+08 2.10E+08 2.10E+08 <br /> umhos/cm 7300 4800 4800 4200 3700 3700 3700 <br />Average Discharge pm 600 600 405 405 405 405 405 <br /> umhos/cm 7300 4800 4800 4200 3700 3700 3700 <br />109-Portal <br />North Mains (aI m 45 45 45 45 45 45 45 <br /> umhos/cm 2900 2900 2900 2900 2900 2900 2900 <br />EMD t0~ m 85 85 85 85 85 85 85 <br /> umhos/cm 2900 2900 2900 2900 2900 2900 2900 <br />6 Right pm 200 200 200 200 200 200 200 <br /> umhos/cm 4700 4700 4700 4700 4700 4700 4700 <br />Water SpraVS <br />Coal reduction <br />ton/ r <br />8,000,000 <br />8,000,000 <br />8,000,000 <br />8,000,000 <br />8,000,000 <br />8,000,000 <br />8,000,000 <br />Usagetdl pm 167 167 167 167 167 167 167 <br />Loss to coal let gpm 55 55 55 55 55 55 55 <br />Recycled pm 100 100 100 100 100 100 100 <br />Net Added m 12 t2 72 i2 12 12 12 <br /> umhos/cm 2900 2900 2900 2900 2900 2900 2900 <br />NMD &NWMD ~'~ pm 30 30 40 100 190 270 <br /> umhos/cm 2000 2000 2000 2000 2000 2000 <br />Diverted to 115 sum m 300 300 350 350 350 350 350 <br />Average Discharge m 42 72 22 32 92 182 262 <br /> umhos/cm 4000 3800 3800 3700 3500 3300 3100 <br />Notes <br />a) Estimated from Annual Mine Inflow Surveys. <br />b) Based upon Annual Mine Inflow Studies <br />c) Estimated from Annual Mine Inflow Survey and area mined. Mining rate is approximately 700 acres <br />and yield is estimated to be 0.027 gpm/ac (see text) <br />d) 1998 usage was 208 gpm at 7,900,000 ions per year, future years pro-rated by production rate <br />e) Water added to coal by sprays estimated from difference between equilibrium and <br />as shipped moistures (1.5°~) <br />f) Estimated from area to be mined. Mining rate is approximately 700 acres and yield is estimated <br />to be 0.027 gpm/ac (see text) <br />g) Water Quality Sources (values rounded to significant figures) <br />WMD: Average of groundwater inflows from WMD and North Main, 1994 Mine Inflow Study <br />Water in Storage: Sample from 115 taken 10/27/98 <br />North Mains: Average of groundwater inflows from WMD and North Main, 1994 Mine Inflow Study <br />EMD: Taken from average of EMD inflow, 1997 Mine Inflow Study <br />Water Sprays: Average for Pond A water (source of underground makeup water, taken from 1997 AHR <br />6 Right: Water sample collected 3/30/99 <br />. NMD &NWMD: Estimated; since they are much further from outcrop, they will be more influenced by <br />the water quality from the Wadge Overburden that has not been affected by spoils <br />TR07-59 Table E51-8 04/02/07 <br />