Laserfiche WebLink
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />Phase III of the stability analysis and the design of the new <br />waste disposal area was completed by Geo-Hydro Consulting, Inc., <br />and approved by the Division on May 4, 1983 ( see Maps 6A-lA <br />thru 1H in Volume 6A). The initial Construction of the West <br />Ridge disposal facilities, located west of the reclaimed waste <br />disposal area, took place during July and August, 1983. Due to <br />surface landowner constraints, construction of the West Ridge <br />disposal area in 1983 was confined within the west boundary of <br />the Temporary Land Use Permit No. CO-030-TU-78-6. A <br />modification of this permit, granted by the BLM on June 11, <br />1984, allowed the expansion of the West Ridge disposal area. <br />Construction of the West Ridge waste pile expansion took place <br />during June and July, 1984. <br />• <br /> <br />TR-46 - 231- 08/05 <br />/~ PPRoveJ <br />9~1~05 <br />