My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-08_REVISION - M1992009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992009
>
2010-02-08_REVISION - M1992009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:34 PM
Creation date
2/9/2010 7:36:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992009
IBM Index Class Name
REVISION
Doc Date
2/8/2010
Doc Name
Submittal
From
Gillette Sand & Gravel
To
DRMS
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gillette Sand & Gravel <br />20575 Hwy. 24 <br />Woodland Park, CO 80863 <br />Office # 719-687-3111 Fax # 719-687-3156 <br />Estimated Cost to Remove Scale for Gillette Pit: <br />• One - 4 cubic yard loader to pickup and place 3 piece scale onto a flatbed truck. <br />¦ 3 hours @ $105 per hour = $315 <br />• One - semi flatbed to transport scale to another location within 50 miles. <br />¦ 4 hours @ $85 per hour = $340 <br />• Two - 4 cubic yard loaders to load scale building onto flatbed truck. <br />¦ 1.5 hours @ $210 per hour =$315 <br />• One - semi flatbed to transport scale building to another location within 50 miles <br />¦ 4 hours @ $85 per hour = $340 <br />• One - 4 cubic yard loader to tear out and break 3'x3'xl 1' (4 each) concrete <br />foundation for scale, tear out and break aprons- north 11'x21', south 25'x21' and <br />place in fill area just north of existing scales. <br />¦ 6 hours @ $105 per hour = $630 <br />Total Estimated Cost for removal = $1940.00
The URL can be used to link to this page
Your browser does not support the video tag.