Laserfiche WebLink
J. J. Dudash -4- February 3, 2010 <br />13. DRMS - All references to the gob vent boreholes mentioned in item number 12 above were <br />removed from Map-09. However, please also remove these references in the table on permit <br />application page 2.05-34. <br />BRL - Amended page 2.05-34 is enclosed. <br />Geotechnical Review <br />The DRMS had six questions and comments (14 through 19) regarding the Maleki overburden <br />stability evaluation. Enclosed is anew January 2010 Overburden Stability Evaluation at the <br />Terror Creek Crossing prepared by Maleki Technologies, Inc. that should satisfy the DRMS' <br />concerns. <br />The following data are enclosed: <br />Volume 1 - Pages 2.04-25, 2.05-34, 75ii, 76, 81, 99, 116 <br />Volume II - Maps- 7, 8, 9, 25 and 27 <br />Volume III- Tab 14, Notification Letter <br />Volume IIIA - Tab 15, pages 25, 26, 35, 36, 46 <br />Volume IIIA - Tab 16, Overburden Stability Evaluation at Terror Creek Crossing <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr.