Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 007 State : Colorado Permitrob# : C-1981-033 <br />Date <br />User <br />01/30/2007 <br />SLB <br />County : Gunnison <br />Site : Bear No. 3 <br />Abbreviation :none <br />Filename : C033-007 <br />Agency or organization name: CDRMS <br />Permit or other job action : RN. No. 5 <br />Task description : Redistribute topsoil over facilities area <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 1/- 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> (CRG) <br />Data source: <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $47.67 NA <br />Operating cost/hour : $54.13 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $134.58 Total fleet cost/hour : $134.58 <br />X :-X <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 CCY factor : 1.125 volume : 5,625 LCY <br />Source of estimated volume : Permit application Volume p. 2.05-23R <br />Source of estimated swell factor : Division estimate <br /> <br />...> <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Source <br />Average push distance : 300 feet <br />Unadjusted hourly production : 311.1 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,000 feet <br />Material weight : 2550 Ibs/LCY <br />Weight description : <br />Earth - Dry packed <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HS) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1da) <br />Spoil pile : 0.60 (fnd-so <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.34 <br />Adjusted unit production <br />Adjusted fleet production <br />104.77 <br />104.77 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 53.69 Hours <br />Unit cost : $1.285 /LCY Total job cost : $7,226