Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 State : Colorado Permit/job# : C-1981-033 <br />Date <br />User <br />County : Gunnison <br />Site : Bear No. 3 <br />Abbreviation :none <br />Filename : C033-006 <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $47.67 NA <br /> Operating cost/hour : $54.13 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $134.58 Total fleet cost/hour : <br />joX $134.58 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,200 CCY factor : 1.125 volume : 5,850 LCY <br /> <br />Source of estimated volume: Estimate from Map 11-3 <br />Source of estimated swell factor : Division estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill 0.75 (a vg.) <br />Average push distance : 60 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 955.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.70 (fnd-mf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.35 <br />Weight description : <br />Earth - Dry packed <br />01/30/2007 <br />SLB <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Adjusted unit production : 337.79 LCY/hr <br />Adjusted fleet production : 337.79 LCY/hr <br />Total job time : 17.32 Hours <br />Unit cost : $0.398 /LCY Total job cost : $2,331