My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-01_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2007-02-01_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:34 PM
Creation date
2/5/2010 9:43:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
2/1/2007
Doc Name
Adequacy Review- Reclamation Cost Estimate
From
Susan Burgmaier
To
Joe Dudash
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinta Software <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date : 01/31/2007 <br />User : SLB <br />State : Colorado <br />County : Gunnison <br />Site : Bear No. 3 <br />Permit/job #: C-1981-033 <br />Abbreviation :none <br />Filename : C033-002 <br />Agency or organization name : CDRMS <br />Permit or other job action : RN No. 5 <br />Task description : Backfill and regrade portal bench and access road <br />............ <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 325C L <br />Horsepower: 140 <br />Weight (MT) : 28.18 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $39.14 NA Shift basis : 1 per day <br />Operating cost/hour:- $47.26 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $119.36 Total fleet cost/hour : $119.36 <br /> <br />:.::::::: ::.:::::::::::::::.:::..:::::.:.:..:..:...................................................... _................................................... . <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,932 LCY factor : NA volume : 7,932 LCY <br /> <br />Source of estimated volume :Operator estimate <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description : AVERAGE - <br />Cycle time value : 0.34 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.22 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.89 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,000 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.833 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 337.97 LCY/hour <br />Adjusted hourly unit production : 280.52 LCY/hour <br />Adjusted hourly fleet production : 280.52 LCY/hour <br />... .: <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 28.28 hours <br />Unit cost : $0.426 per LCY Total job cost : $3,375 <br />
The URL can be used to link to this page
Your browser does not support the video tag.