Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action : RN. No. 5 <br />Task description : Regrade facilities area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $47.67 NA <br /> Operating costihour : $54.13 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $134.58 Total fleet cost/hour : $134.58 <br />77777777 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,823 CCY factor : 1.125 volume : 12,176 LCY <br /> <br />Source of estimated volume : Assume V layer over 6.71 acre area <br />Source of estimated swell factor : Division estimate <br /> <br />HOURLY PRODUCTION) Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 600.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.75 (user)) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.38 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 227.31 LCY/hr <br /> Adjusted fleet production : 227.31 LCY/hr <br /> <br />:.::..;::.:.: <br />JOB TIME AND COST ...;...... , . , :.:.::::...... <br />Fleet size : 1 Dozer(s) Total job time : 53.56 Hours <br />Unit cost : $0.592 /LCY Total job cost : $7,208 <br />