My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-02_REVISION - M2001085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001085
>
2010-02-02_REVISION - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:16 PM
Creation date
2/4/2010 7:26:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
REVISION
Doc Date
2/2/2010
Doc Name
Amendment Approval
From
DRMS
To
Les Ewegen LLC
Type & Sequence
AM4
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V YV <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis : <br />Material weight : 2,650 pounds/LCY Struck volume : 32.00 LCY <br />Material description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Rated payload : 104,000 pounds <br />Payload capacity : 39.25 LCY <br />Cycle Time : <br />Scraper loading time * : 1.10 <br />Maneuver and spread time : 0.60 <br />* load time per scraper pair on push-pull models <br />Heaped volume : 44.00 LCY <br />Average volume : 38.00 LCY <br />Adjusted capacity : 38.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : -5,_030 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time : <br />Road condition description: Hard, smooth, stabilized, surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,500 -2.00 2.00 0.00 3067 0.68 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.68 minutes <br />00 2920 0.68 <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.68 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.06 minutes <br />Unadjusted unit production/hour : 1,491.85 LCY/hour *** Adjusted for job conditions : 1,238.23 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 1,238.23 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 4,952.94 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Team(s) Total job time : 65.82 Hours <br />Unit cost : $0.627 /LCY Total job cost : $204,558 <br /> <br />..O - >r- 1.
The URL can be used to link to this page
Your browser does not support the video tag.