Laserfiche WebLink
oti <br />sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DBMS <br />Task # : SCR State : Colorado Permit/job #:M-2001-085 <br />Date : 0112812010 County:Adams Abbreviation :none <br />User : DB2 Site :120Th Estates Pit Filename : M085-SCR <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Permit or other job action : Am-04 Bond Recalc <br />Task description : Fill to Cover Clay liner - scraper scenario <br />Cost Bre <br />Scraper work team -Scraper : Cat 657E w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area : Cat D7R DS Series 11 - 7SU <br />Road maintenance -Motor grader : CAT 143H <br />-Water truck :Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer grader misctruk <br />% Utilization-machine : 100 NA NA 100 50 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $113.35 NA NA $40.93 $31.80 $8.32 <br />Operating cost/hour : $202.03 NA NA $53.15 $19.49 $3.75 <br />Ripper op. cost/hour : NA NA NA $0.00 $0.00 NA <br />Operator cost/hour : $38.91 NA NA $38.54 $38.91 $38.70 <br />Unit subtotals : $354.29 NA NA $132.61 $90.19 $50.76 <br />Number of units : 8 0 0 1 1 1 <br />Group subtotals : Work : $2,834.30 Support : $132.61 Maintenance : $140.95 <br />Total work team cost/hour : $3,107.86 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 326,000 LCY factor : NA volume : 326,000 LCY <br />Source of quantity take-off :estimated from Ground Eng rpt <br />Source of estimated swell factor : NA