<br />amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: January 16, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Reporting Period: 1/10/10 through 1/16/10 <br />Days S M T W IT F S <br />Work Shifts - D D D D D D <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 22°F to 3VF (+/-) High: 36°F to 5IT (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No issues <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Clearing and grubbing was performed at the East Cresson Clay Borrow using a CAT 330 <br />excavator, a CAT D-6 dozer and, two 40-ton haul trucks. Trees/slash was stockpiled in a <br />designated area within the clay borrow area. <br />B) Stripping <br />1) VLF <br />Topsoil stripping was performed at the East Cresson Clay Borrow using two CAT D8 dozers. <br />Topsoil was stockpiled temporarily and will be hauled to the permanent topsoil stockpile later. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations E7+00 (+/-) and E14+00 (+/-), <br />approximately, 100 to 150 feet right of centerline and between station H12+00 (+/-) and <br />H25+00 (+/-), approximately 50 to 150 feet left of centerline. Slope contouring was performed <br />VLF Weekly Report WE 01.16.1O.D.doc