My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-01_REPORT - M1983194 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1983194
>
2010-02-01_REPORT - M1983194 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:11 PM
Creation date
2/1/2010 2:54:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REPORT
Doc Date
2/1/2010
Doc Name
Annual report
From
Natural Soda
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.3 2009 Monthly Production Tons Summary <br />Table 3.2 <br /> <br /> <br />Beginning <br />Ending Inventory <br />Calculation <br /> Month Invento Production Sales Inventory Stored <br />Product Product <br />in <br />Transit <br /> Jana <br />u 4509 8283 7413 4929 4467 462 <br /> Februa 4929 7778 7306 5401 5215 186 <br /> March 5401 7214 7216 5399 4947 454 <br /> April 5399 7973 8357 5015 4637 378 <br /> May 5015 7454 8133 4336 3719 616 <br /> June 4336 7196 8013 3519 2934 585 <br /> Jul 3519 7851 8412 2958 2204 753 <br /> Au US' 2958 8344 7781 3521 2800 721 <br /> September 3521 7319 7840 3002 2452 550 <br /> October 3002 9145 8586 3561 2881 680 <br /> November 3561 9383 8263 4681 4155 526 <br /> December 4681 9128 8317 5491 4858 633 <br /> TOTALS 97,068 95,637 <br /> <br />3.1.4 Regulatory Review <br />NSI submitted routine Sundry Notices, monthly, quarterly, and annual reports to appropriate <br />agencies. The following summarizes regulatory related activities: <br />• No wells were plugged and abandoned in 2009. <br />• Two (2) exploration core holes were completed in the eastern portion of Panel 2. <br />• Injection and recovery well pairs were completed in cavity IOH andI IH, in the eastern portion <br />of Panel 2. <br />• The two exploration core holes were converted to monitor wells, DS-4 and BG-5. <br />• Twelve site inspections by the BLM and one inspection by the EPA. <br />3.2 Proposed 20IOActivities and Schedule <br />3.2.1 Processing <br />Natural Soda, Inc. anticipates sales in excess of 100,000 tons in 2010. Approximately five boil <br />outs of five-day durations are planned in 2010. Although no process modifications are <br />anticipated in 2010, plans continue to expand the plants capabilities over the next several years. <br />3.2.2 Well field <br />During 2010, it is anticipated that several exploration holes will be completed to the east of <br />Cavity 5. If practicable, at least one of the wells will be converted to an A-groove monitor well. <br />In addition, wells 93-2M and lA-5HR are scheduled to be plugged and abandoned. <br />2009 Annual Report 3 of 33
The URL can be used to link to this page
Your browser does not support the video tag.