My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-09_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2008-04-09_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:19 PM
Creation date
1/29/2010 1:36:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
REVISION
Doc Date
4/9/2008
Doc Name
2nd Adequacy Review Letter
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinci Software <br />MOTOR GRADER WORK <br />PROJECT IDENTIFICATION <br />Task #: 009 State : Colorado Permitljjob # : C-1983-059 <br />Date <br />User <br />0410912008 County : Delta <br />JRS Site : Terror Creek Loadout Filename : C059-009 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Finish Grade Entire Site <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 14H Horsepower : 215 <br />Attachment no. 1 : NA <br />Shift basis : 1 per day <br />MATERIAL QUANTITIES <br />Attachment no. 2 : Multi-shank ripper <br />Data source : (CRG) <br />Total area to be graded or ripped : 4.50 acres <br />Source of estimated acreage :Map 5 <br />HOURLY PRODUCTION <br />Selected application <br />Average grader speed <br />Selected blade angle <br />Effective blade length <br />Width of blade overlap per pass <br />Net grading or ripping width per pass <br />Unadjusted hourly unit production <br />Finish grading (0-2.5 mph) <br />1.25 mph <br />30 degrees " <br />12.10 feet <br />2.00 feet <br />10.10 feet " <br />1.5303 acres/hour <br />Abbreviation :none <br />" at 0 degrees, blade is perpendicular <br />to direction of travel. <br />•' width of ripper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 5,800 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1 sh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1.3008 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 3.46 hours <br />Unit cost : $89.32 per acre Total job cost : $402
The URL can be used to link to this page
Your browser does not support the video tag.