My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-09_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2008-04-09_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:19 PM
Creation date
1/29/2010 1:36:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
REVISION
Doc Date
4/9/2008
Doc Name
2nd Adequacy Review Letter
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 006 State :Colorado Permitfjob # : C-1983-059 <br />Date : 0410912008 County : Delta <br />User : JRS Site : Terror Creek Loadout <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Rip Light-Use Road, Water Tank, RR Track and Haul Road <br />. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA <br />Area : 0.80 <br />acres <br />Selected estimating method : Area <br />Load factor : NA Bank volume <br />Rip depth (ft) : 2.00 Volume <br />NA <br />2,581 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Map 5 <br />Source of estimated load factor : NA <br /> <br /> <br /> <br />HOURLY PRODUCTION . .... ........... , <br />.. <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 3,553.84 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.63 feet/pass Site altitude : 5,800 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.838 acres/hour Adjusted unit production : 2,949.69 cu. yds./hour <br />Unadjusted production : 3,553.84 cu. yds./hour Adjusted fleet production : 2,949.69 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 0.88 hours <br />Unit cost : $0.073 per cu. yd. Total job cost : $187 <br /> <br />Abbreviation :none <br />Filename :C059-006
The URL can be used to link to this page
Your browser does not support the video tag.