Laserfiche WebLink
Task description : Demolish and Remove AM Structures <br />UNIT COSTS Last unit cost update : January, 2003 Location adjustment : 100.20% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />Conveyors <br />-Truck Dump to Primary 180 LF Conveyor, overland - 5'W x 6'H 180.00 LF $12.7500 $Z295.00 <br />-Primary to Secondary 80 LF Conveyor, overland - 5'W x 6'H 80.00 LF $12.7500 $1,020.00 <br />-Primary to Transfer 100 LF Conveyor, overland - 5'W x 6'H 100.00 LF $12.7500 $1,275.00 <br />-Crusher to Secondary 80 LF Conveyor, overland - 5'W x 6'H 80.00 LF $12.7500 $1,020.00 <br />-Secondary to Transfer 46 LF Conveyor, overland - 5'W x 6'H 46.00 LF $12.7500 $586.50 <br />-Reclaim 60 LF Conveyor, overland - 5'W x 6'H 60.00 LF $12.7500 $765.00 <br />-Reclaim to Transfer 100 LF Conveyor, overland - 5'W x 6'H 100.00 LF $12.7500 $1,275.00 <br />-Transfer toLoadout 100LF Conveyor, overland -5'Wx 6'H 100.00 LF $12.7500 $1,275.00 <br />. Conveyor Footings 2x 1 W14 LF Demo./disp. exc. pit, 1x2' - 200 R. 14.00 LF $4.9924 $69.89 <br /> <br />-Railroad Tracks 1,650 LF Railroad track - Ties and track 1,650.00 LF $6.5200 $10,758.00 <br />Ballast 1,100 CY Railroad track - Ballast 1,100.00 Cy $2.9400 $3,234.00 <br /> <br /> <br /> <br />-Remove Fencing Around Substations 164 LF Fencing, chain link - 8-10 R. H 164.00 LF $1.9400 $318.16 <br /> <br />-Remove Retaining Wall 272x7.5x12" Demo./disp. exc. pit, 12"th.-200 ft. 2,040.00 SF $3.4374 $7,012.29 <br />. Fooling 1 x2x 128 LF Demo./disp. exc. pit, 1x2' - 200 R. 128.00 LF $4,9924 $639.03 <br /> <br />-Concrete Sump 36.5x36.5x6" DemoAdisp. exc. pit, 6"th.-200 R. 1,332.00 SF $1.2481 $1,662.47 <br /> <br />-Powedines and Poles 1115 LF Power/phone line - single pole 1,115.00 LF $2.1400 $2,386.10 <br /> <br />-Coal Loadout Bin 10x6xl2' Demo./disp./excav. pit - 200' push 720.00 CF $0.1588 $114.37 <br /> <br />-Road Pavement 300x24x6" Pavement, bitum. - 4-6" th. 800.00 Sy $4.7500 $3,800.00 <br />-Guard Rails 1140 LF Roadside quiderad and posts 1,140.00 LF $7.7200 $8,800.80 <br /> <br />-Stoker Oil Building Expansion Superstructure 10x10x101 Demo./disp./excav. pit - 200' push 1,000.00 CF $0.1345 $134.53 <br />Floor 10x 10x4" Demo./disp. exc. pit, 4" th.- 200 R. 100.00 SF $0.8321 $83.21 <br />Walls 10x12x4" Demo./disp, exc, pit, 4" th.- 200 R. 120.00 SF $1,1458 $137.50 <br /> <br />-Reclaim Tunnel Superstructure 60'x8x8' Demo/disp./appr. dump - to 5 mi. 3,640.00 CF $0.6936 $2,663.29 <br />Floor 60x5x6' Demo./disp. exc, pit, 6" th.- 200 R. 300.00 SF $1.2481 $374.43 <br />Escapeway 36x 180 LF Pipe, CMP - 36 in. diam. 160.00 LF $26.2046 $4,716.83 <br /> <br />-Remove Five Barrels of Haz Waste 5@55 Gallons Haz. waste - Drum mat., 1-6 dr. 5.00 DRUM $381.5459 $1,907.73 <br /> <br />Tank Removal <br />-6,000 Gallon Fuel Tank 6,000 Gallons Excfload, non-leaking-6K- BKgal. 1.00 EA $593.0000 $593.00 <br />-4,000 Gallon Water Tank 4,000 Gallons ExcAoad, non-leaking-3K- 5Kgal. 1.00 EA $369.5000 $369.50 <br />-1,500 Gallon Antifreeze Tank 1,500 Gallons Exc.Aoad, non4eaktng-3K- 5Kga/ 1.00 EA $369.5000 $369.50 <br />-6,000 Gallon Antrfreeze Tank 6,000 Gallons ExcAbad, non-leaking-6K- 8Kgal. 1.00 EA $593.0000 $593.00 <br />-350 Gallon Diesel and Unleaded Fuel 2@350 Gallons ExcAoad, non-leaking-3K- 5Kga/. 2.00 EA $369.5000 $739.00 <br />-7,000 Gallon Tank by Crusher 7,000 Gallons ExcAbad, non-leaking-6K- BKgal. 1.00 EA $593,0000 $593.00 <br />- Remove Sludge from All Tanks 5 Tanks Remove contents - 3K- 5K gal. 5,00 EA $148,0000 $740.00 <br />Dispose of Sludge OH-Site Assume 1, 000 Gallons Off-site sludge disposal - Avg. 1,000.00 GAL $3.8000 $3,800.00 <br />Add C02 for Tank Cleaning 25,000 Gallons Total Insert dry ice - 1.5 lbs.1100 gal. 375.00 LB $1.7900 $671.25 <br />Haul Tanks to Certified Dump 6 Tanks Haul to cert. dump - 3K- 5K gal, 6.00 EA $550.0000 $3,300.00 <br /> <br />-Petroleum Contaminated Soil Clean-Up Assume 200 CY Contam. soil disp., landfill -Avg. 200.00 CY $189.9800 $37,996.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $108,we Total Cost (adjusted for location): $108,305