My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-09_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2008-04-09_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:27:19 PM
Creation date
1/29/2010 1:36:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
REVISION
Doc Date
4/9/2008
Doc Name
2nd Adequacy Review Letter
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EstimatinaSoftware <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />Control Tower Superstructure 16x145(26' Demoldisp./excav. pit - 200' push 5,824.00 CF $0.1588 $925.12 <br />- Floor 165(14x6' Demo./disp. exc. pit, 6"th.-200 ft. 288.00 SF $1.2481 $359.45 <br /> <br />-Substation Superstructure 16x245(20' Demo./disp./excav. pit-200'push 7,680.00 CF $0.1588 $1,219.93 <br />Floor 125(10x8' Demo./disp. exc. pit, 8'th.- 200 ft. 120.00 SF $1.6641 $199.70 <br />Footing 1x2x441F Demo./disp. exc. pit, 1x2'-200 ft. 44.00 LF $4.9924 $219.67 <br /> <br />-Secondary Substation Superstructure 9x4x6' Demo./disp./excav. pit - 200' push 216.00 CF $0.1345 $29.06 <br />- Floor 165(61W Demo./disp. exc. pit, 8"th.- 200 ft. 96.00 SF $1.6641 $159.76 <br /> <br />-Storage Building Superstructure 525(12x8' Demo./disp./excav. pit - 200' push 4,992.00 CF $0.1345 $671.56 <br />Floor 52x 12'x6" Demo./disp. exc. pit, 61 th.-200 ft. 624.00 SF $1.2481 $778.81 <br /> <br />-Scale House Superstructure 95(8'x8' Demoldisp./excav. pit - 200' push 576.00 CF $0.1345 $77.49 <br />Floor 9x85(8" Demo./disp. exc. pit, 8'th.- 200 ft. 72.00 SF $1.6641 $119.82 <br /> <br />-Trailer Near Garage 575(10'x11' Demo./disp./excav. pit - 200' push 6,270.00 CF $0.1345 $843.49 <br /> <br />-Stoker Oil Shed Superstructure 28x10x9' Demo./disp./excav. pit - 200' push 2,460.00 CF $0.1345 $330.94 <br />Floor 28x10x6" Demo./disp. exc. pit, 6'th.-200 ft. 280.00 SF $1.2481 $349.47 <br />Footing 3".5x76 LF Demo./disp. exc. pit, 1.510-200 ft. 76.00 LF $11.2329 $853.70 <br /> <br />-Bath House Superstructure 60'x10x8' Demo./disp./excav. pit-200'push 4,800.00 CF $0.1345 $645.73 <br /> <br />-Over-the-Track Coal Bin Structure 14'x125(34' Demo./disp./excav. pit - 200' push 5,712.00 CF $0.1588 $907.32 <br />- Footing 2x2'xl6LF Demaldisp. exc. pit, 2x3'-200 ft. 16.00 LF $14.9772 $239.63 <br /> <br />-Walkway and Stairway Structure 2405(3.3x3.5' Demo./disp./excav. pit - 200' push 2,772.00 CF $0.1345 $372.91 <br />- Concrete Pads 5Q4'x4'x6' Demoldisp. exc. pit, 6'th.- 200 ft. 80.00 SF $1.2481 $99.84 <br /> <br />-Rail Car Puller Structure 85(8x4' Demo./disp./excav. pit - 200' push 256.00 CF $0.1345 $34.44 <br />Slab 10x10'x12" Demo./disp, exc. pit, 12"th.-200 ft. 100.00 SF $2.4962 $249.62 <br /> <br />-Primary Screener Superstructure 365(14x14' Demo./disp./excav, pit - 200' push 7,056.00 CF $0.1588 $1,120.81 <br />Slab 40xi8x8' Demoldisp. exc. pit, 81 th.-200 ft. 720.00 SF $1.6641 $1,198.17 <br /> <br />-Crusher Superstructure 8x8x8' Demo./disp./excav. pit - 200' push 512.00 CF $0.1345 $68.88 <br />Slab 12'x10'x8" Demoldisp. exc. pit, 8" th.- 200 ft. 120.00 SF $1.6641 $199.70 <br /> <br />-Secondary Screener Superstructure 36x9x 14' Demo./disp./excav. pit - 200' push 4,536.00 CF $0.1588 $720.52 <br />Slab 40xl4x8' Demo./disp. exc. pit, 81 th.- 200 ft. 560.00 SF $1.6641 $931.91 <br /> <br />Radial Stackers <br />-Secondary to Reclaim 110'x3x30' Demo./disp./excav. pt-200'push 9,900.00 CF $0.1588 $1,572.57 <br />- Footing 1.5x3x50' Demo./disp. exc. pit 1.5x3'-200 ft. 50.00 LF $11.2329 $561.64 <br />-Secondary to Pita 100x3 x 10' Demo./disp./excav. pit - 200' push 3,000.00 CF $0.1345 $403.58 <br />- Footing 1.5x3x50' Demo./disp. exc. pit, 1.5x3-200 it. 50.00 LF $11.2329 $561.64 <br />-Pnmary to Lump Pile 100x35(10' Demo./disp./excav. pit - 200' push 3,000.00 CF $0.1345 $403.58 <br />- Footing 1.5x3x50' Demo./disp, exc. pit, 1.5x3'-200 ft. 50.00 LF $11.2329 $561.64 <br /> <br />-Truck Dump Superstructure 24'x 185( 14' Demo./displexcav. pit - 200' push 6,048.00 CF $0.1588 $960.70 <br /> <br /> <br /> <br /> <br /> <br /> <br />Culverts <br />-CMP #2 12"x25 LF Pipe, CMP - 12 in. diam. 25.00 LF $2.1737 $54.34 <br />-CMP #3 and CMP #4 187X95 LF Ape, CMP - 18 in. diam. 95.00 LF $2.3533 $223.57 <br />-Pn'nciple Spillway at Sediment Pond 12'x80 LF Rpe, CMP - 12 in. diam. 80.00 LF $2.1737 $173.90 <br /> <br />JOB COST Subtotal (unadjusted): $19,405 Total Cost (adjusted for location): $19,443
The URL can be used to link to this page
Your browser does not support the video tag.