Laserfiche WebLink
RULE NO. EXHIBIT NO. TITLE VOLUME <br /> 2 <br />04 <br />5(1) 7 <br />1 <br /> . <br />. - Hydrological Monitoring Sites 4 <br /> 2.04.7(4) 7-2 Wadge Overburden/Alluvium Potentiometric <br /> Surface Map 4 <br /> 2.04.7(4) 7-3 Wadge Coal Potentiometric Surface Map 4 <br /> 7-4 Wadge Underburden Potentiometric Surface Map 4 <br /> <br /> 2.04.9(1)(c) 9-1 Soil Types and Soil Salvage Map (2 sheets) 5 <br /> 2.04.10(1) 10-1 Vegetation Map (2 sheets) 5 <br /> 10-2 Adjacent Vegetation and Habitat Types 5 <br /> 10-3 Yoast Mine Reference Areas 5 <br /> 2.04.11 11-1 Wildlife Study Locations and Observations 5 <br /> <br /> 2.05.3 12-1 Operations Plan (2 sheets) 6 <br /> 2.05.3(2)(a) 12-1A Operations Plan - Topsoil Removal 6 <br /> <br /> 2.05.3(3) 13-1 Facilities Map - Mine Area and Haul Road (2 Sheets) 7 <br /> 2.053(4) 13-2 <br />13-3 Surface Water Control Plan (2 Sheets) <br />S <br />f <br />W <br />C <br />' 7 <br /> ur <br />ace <br />ater <br />ontrol Plan (1000 <br />Scale) 7 <br /> 13-4 Proposed Pond 010 7 <br /> 134A As-Built Pond 010 7 <br /> 13-4B Pond 010 Existing Watershed Conditions <br /> August 2006 7 <br /> 13-5 Proposed Pond 011 7 <br /> 13-5A As-Built Pond 011 7 <br /> 13-513 Pond 0I IA 7 <br /> 13-5C Pond 011A As-Built 7 <br /> 13-6 As-Built Pond 012 7 <br /> 13-7 As-Built Pond 013 7 <br /> 13-8 Sediment Pond 012A As-Built 7 <br /> 13-9 Typical Haul Road Details 7 <br /> 13-10.1 Yoast Haul Road "A" (As-Built) 7 <br /> 13-10.2 Yoast Haul Road "A" (As-Built) 7 <br /> 13-10.3 Yoast Haul Road "A" (As-Built) 7 <br /> 13-10.4 <br />13-10 <br />5 Yoast Haul Road "A" (As-Built) <br />Y <br />t H <br />l R <br />d " <br />" <br />- 7 <br /> . oas <br />au <br />oa <br />A <br />(As <br />Built) 7 <br /> 13-10.6 Yoast Haul Road "A" (As-Built) 7 <br /> 13-11.1 Yoast Haul Road "B" (As-Built) 7 <br /> RN -03 Revised 01A0