Laserfiche WebLink
0 RULE NO.* EXHIBIT NO. TITLE VOLUME <br />13-11.2 Yoast Haul Road "B" (As-Built) 7 <br />13-11.3 Proposed Haul Road "B" Extension 7 <br />2.05.3(4) 13-11.4 Proposed Haul Roads "C" & "D"(2 sheets) 7 <br />13-11.5 Proposed Haul Roads "B", "C", & "D" Profiles 7 <br />13-11.6 Pond 010 Temporary Access Road Design 7 <br />13-12 Field Measurements and Photogeologic <br /> Estimates Map, (2 Sheets) 7 <br />13-12.1 Yoast Mine Watershed 6a <br />13-12.1A Permanent Channels and Pond Watersheds 6a <br />13-12.2 Pond 012 Design (Phase 2) 6a <br />13-12.3 Proposed Pond 013 Design 6a <br />13-12.4 Proposed Pond 014 Design 6a <br />13-12.7 Pond 012A Design 6a <br />13-12.8 Stockpond ST-1 As-Built 6a <br />13-13 650 D <br />li <br />D <br />dh <br />d R <br /> rag <br />ne <br />ea <br />ea <br />oute 7 <br />13-14 650 Dragline Deadhead Route - Existing <br /> Ground Profile from Haul Road "A" 7 <br />13-15 650 Dragline Deadhead Route - Drainage <br /> Cross Sections Under Powerlines 7 <br />13-16 Haul Road D As-Built (0 + 00 to 48 + 53) 7 <br />13-17 Pond 014 As-Built 7 <br />2.05.6.(3) 16-1 Water Rights in the Vicinity ofYoast Mine 8 <br />2.06.8 16-2 Alluvial Deposits Along Dry Creek, <br /> Sage Creek, and Grassy Creek (2 Sheets) 8 <br />16-2 Alluvial Deposits Along Grassy <br /> Creek and Tributaries (3 Sheets) 8 <br />16-3 Land Use, Flood Irrigated, and Subirrigated <br />16-4 Areas Along Grassy Creek and Tributaries (2 Sheets) 8 <br />17-1 Mining Induced Drawdowns in the Overburden <br /> and Wadge Coal Aquifers 8 <br /> <br />2.05.4 19-1A Backfilling and Grading Plan 9 <br />20-1 Five-Year Disturbance Boundary, 9 <br />RN -03 Revised 01A0