Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.88 0.88 Total non-roadable mob/demob cost <br />Return time (hours) = 0.88 0.88 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** <br />Unloading time (hours) = 0.50 NA *• one round trip, no haul rig <br />Subtotals = 2.75 1.75 <br />Pagosa Springs <br />35.0 miles <br />40.0 mph <br />$1,807.44 <br />$0.00 <br />............... ........ _. <br />JOB TIME AND COST Total job time : 5.50 hours <br />Total job cost : $1,807 <br />EQUIPMENT HAUL DISTANCE and TIME