My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-11_PERMIT FILE - M2009078
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009078
>
2010-01-11_PERMIT FILE - M2009078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:29 PM
Creation date
1/21/2010 9:34:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009078
IBM Index Class Name
PERMIT FILE
Doc Date
1/11/2010
Doc Name
Reclamation Liability Estamate
From
DRMS
To
Greg Lewicki and Associates
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PUMPING WORK <br />PROJECT IDENTIFICATION <br />Task no.: 01a State :Colorado Permit/job no.: M-2009-078 <br />Date <br />User <br />01/11/2010 <br />GRM <br />County :Moffat <br />Site :Gehrman Pit <br />Abbreviation :none <br />Filename :M078-01a <br />Agency or organization name Division Of Reclamation And Mining <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description : Pump pit clear for reclamation <br />.:.........:...:::.. <br />HOURLY EQUIPMENT COST <br />Data <br />I_ ... I Oijantity Source <br />pump: Centrifugal pump - 200M, 10 in. 3 (GR(v) <br />Suction hose : Suction pipe - 10 in. diam., 25 ft. 2 (CRG) <br />2 (CRG) <br />Discharge hose :Discharge pipe - 10 in. D., 25 ft. <br />Labor:NA 0 NA <br />Cost Breakdown : <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total cost/hour : <br />Job Utilization <br />$16.60 NA . <br />$59.18 100 % <br />$0.00 NA <br />875.78 <br />Job shiftbasis : 3 per day <br />Horsepower: 70 <br />Weight (UST) : 1.95 <br />Total fleet cost/hour : $75.78 <br /> <br />PUMPING QUANTITIES ............... <br />Initial pond Conversion Final pond <br />00 acre feet <br />olume : 273 factor : 325,850.5800 volume : 88,957,208 gallons <br />. <br />v <br />Total pond inflow surface Unit inflow rate in Total pond inflow volume <br />ft <br />230 s <br />5 gph/sq. ft.: 0.1758 per hour : 919.43 gph <br />. <br />q. <br />, <br />area : <br />Source of volume estimate :Exhibit E and L - <br /> <br />PUMPING TIME <br />Maximum pump capacity : 70 <br />gph/pump <br />Adjusted pumping capacity : <br />279,000 <br />gph <br />Estimated suction head : 25 feet Initial unadjusted pumping time . 318.84 hours <br />Estimated discharge head : 50 feet Inflow during initial pumping : 293,155 gallons <br />Total head : 75 feet Net unadjusted pumping time : 319.89 hours <br />CPB pump capacity : 93,000 gph/pump Altitude adjustment factor : 1.0638 (3% rule) <br />Site altitude : 6,200 feet Pump efficiency factor : 1.0909 (55 min./hr.) <br />ond volume : NA <br />f <br />fl <br />% <br />I % Total adjusted pumping time : 371.25 hours <br />o <br />p <br />ow as <br />n <br />JOB TIME AND COST <br /> Total job time : 371.25 hours <br />Unit cost : $0.000315 per gallon Total job cost : $28,131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.