Laserfiche WebLink
diameter, will be used to prevent puncturing the liner. The backfill material will be <br />• compacted with a smooth drum roller. <br />Denison will provide certification by a professional engineer or other appropriately <br />qualified professional that will confirm that the facility was constructed in accordance <br />with the approved design plan. <br />• <br />• <br />15-2 <br />T:\64986-Denison Mines\Task Order 4 -EPP Sunday Mines Group-Van4\Van40RMS RTC and Revised EPP\FINAL DRMS Report - EPP Van4.doc