Laserfiche WebLink
Permit No. COG-850000 <br />Facility No. COG-850044 <br />Page lb <br />Permit Limitations and Monitoring Requirements for Post Mining, Outfalls 005, 006, 007, 008, 009A, 009B, and 010 <br />t.,?"7?'v )i. ,?µ a ti is <br />?tfq :r, '?}s.? ? ?`?laIli S Ieammeter , x # y Ratinale "? ?• <br />?..: <br />I 1t ilk <br />----- General Permit Requirements ----- <br />Flow, MGD Report NA Report Discharge Evaluation Continuous / z <br />Instantaneous Recorder r / <br />In-situ <br />pH, s.u. N/A NA 6.5-9.0 Water Quality Standards 2 days/month Grab <br />Total Suspended Solids, mg/1 30 45 NA State Effluent Regulations 2 days/month Grab <br />Oil and Grease, mg/1 N/A NA 10 State Effluent Regulations 2 days/month Visual' <br />-- Federal Effluent Limitation Guidelines -- <br />Settleable Solids, ml/1 Report NA 0.5 Federal ELG 2 days/month Grab <br /> Site Specific Limitations <br />Total Dissolved Solids, mg/1 • Report NA Report Salinity Regulations Quarterly 4 Grab <br />Potentially Dissolved Selenium, Report NA Report TMDL / 303(d) Monthly Grab <br />ug/1 <br />1 - For a minor facility, as determined by the EPA NPDES Permit Rating Worksheet, all weekly monitoring requirements shall be changed to 2 days per month. <br />2 - If power is not available, flow may be measured on an instantaneous basis. Major facilities shall monitor flow weekly, minor facilities 2 days / month <br />3 - If a visual sheen is noticed, a grab sample must be taken and analyzed for oil and grease <br />4 - Quarterly monitoring shall be prescribed if the limitation is based upon discharge to the Colorado River Basin. If the limitation is based upon agricultural protection, <br />the monitoring frequency shall be weekly. <br />ALTERNATE LIMITATIONS FOR POST-MINING RECLAMATION AREAS <br />Any discharge or increase in the volume of a discharge from a reclamation area, caused by precipitation within any 24-hour <br />period greater than the 10-year, 24-hour precipitation event (or snowmelt of equivalent volume) mgy substitute the following <br />limitations for these specific parameters only, subject to burden of proof requirements described in Part I.B.6 of the permit. <br />Limitations` <br />l_4 Parameter 30-Da}! 7-Day K;y , Rationale MamtQ Sample <br />Fre tlenc T e <br />Avg, Aye <br />----Federal Effluent Limitation Guidelines------- <br />Settleable Solids, ml/1 Report NA Report Federal ELG Weekly Grab <br />Sediment Control Plan - Applicable to Reclamation Areas Served by Outfall 005, 006, 007, 008, 009A, 009B and 010. <br />The Sediment Control Plan requirements in Part I.B.3.b. of the permit apply to the reclamation areas at this facility. The permittee <br />shall prepare and submit a Sediment Control plan by July 1, 2009. The Division will review the Sediment Control Plan and approve <br />it. Once approved by the Division, the Sediment Control Plan will become a part of this permit certification by reference. <br />Compliance Schedule for Sediment Control Plan for Reclamation Areas <br />Code 12505 A Sediment Control Plan shall be prepared and submitted by July 1, 2009 for the Reclamation Areas as required under <br />Part I.13.3.b. of the CDPS General Permit for Coal Mining Facilities and 40 CFR 434.82. The plan required by this compliance <br />schedule shall be directed to the Industrial Unit of the Permits Section for final review. <br />Code tt`? <br />x , i" ` <br />Description <br />r- t Gitalh#irue Date <br />Permtt <br />12505 Submit Plan Submit Sediment Control Plan Part LB.3.b. 07101109 <br />Other Conditions <br />Antide radation <br />Antidegradation review does not apply to this permit because the receiving stream is classified as Use Protected. <br />Total Maximum Daily Loads / 303(d) Listings <br />Segment 04 and the main stem of the Purgatoire River are on the 303(d) list as impaired for selenium with a designation of a Low <br />priority. A TMDL has not yet been developed or finalized, and therefore waste load allocations have not been made for this <br />parameter. At such time as a TMDL is complete, this certification may be reopened, and limitations and or monitoring requirements <br />may be added. Until such time, monitoring and reporting of this parameter will be required.