My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-19_HYDROLOGY - C1996084
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996084
>
2010-01-19_HYDROLOGY - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:39 PM
Creation date
1/19/2010 9:13:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
HYDROLOGY
Doc Date
1/19/2010
Doc Name
NPDES Modified Permit
From
New Elk Coal Company
To
DRMS
Permit Index Doc Type
NPDES
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit No. COG-850000 <br />Facility No. COG-850044 <br />Page lb <br />Permit Limitations and Monitoring Requirements for Post Mining, Outfalls 005, 006, 007, 008, 009A, 009B, and 010 <br />t.,?"7?'v )i. ,?µ a ti is <br />?tfq :r, '?}s.? ? ?`?laIli S Ieammeter , x # y Ratinale "? ?• <br />?..: <br />I 1t ilk <br />----- General Permit Requirements ----- <br />Flow, MGD Report NA Report Discharge Evaluation Continuous / z <br />Instantaneous Recorder r / <br />In-situ <br />pH, s.u. N/A NA 6.5-9.0 Water Quality Standards 2 days/month Grab <br />Total Suspended Solids, mg/1 30 45 NA State Effluent Regulations 2 days/month Grab <br />Oil and Grease, mg/1 N/A NA 10 State Effluent Regulations 2 days/month Visual' <br />-- Federal Effluent Limitation Guidelines -- <br />Settleable Solids, ml/1 Report NA 0.5 Federal ELG 2 days/month Grab <br /> Site Specific Limitations <br />Total Dissolved Solids, mg/1 • Report NA Report Salinity Regulations Quarterly 4 Grab <br />Potentially Dissolved Selenium, Report NA Report TMDL / 303(d) Monthly Grab <br />ug/1 <br />1 - For a minor facility, as determined by the EPA NPDES Permit Rating Worksheet, all weekly monitoring requirements shall be changed to 2 days per month. <br />2 - If power is not available, flow may be measured on an instantaneous basis. Major facilities shall monitor flow weekly, minor facilities 2 days / month <br />3 - If a visual sheen is noticed, a grab sample must be taken and analyzed for oil and grease <br />4 - Quarterly monitoring shall be prescribed if the limitation is based upon discharge to the Colorado River Basin. If the limitation is based upon agricultural protection, <br />the monitoring frequency shall be weekly. <br />ALTERNATE LIMITATIONS FOR POST-MINING RECLAMATION AREAS <br />Any discharge or increase in the volume of a discharge from a reclamation area, caused by precipitation within any 24-hour <br />period greater than the 10-year, 24-hour precipitation event (or snowmelt of equivalent volume) mgy substitute the following <br />limitations for these specific parameters only, subject to burden of proof requirements described in Part I.B.6 of the permit. <br />Limitations` <br />l_4 Parameter 30-Da}! 7-Day K;y , Rationale MamtQ Sample <br />Fre tlenc T e <br />Avg, Aye <br />----Federal Effluent Limitation Guidelines------- <br />Settleable Solids, ml/1 Report NA Report Federal ELG Weekly Grab <br />Sediment Control Plan - Applicable to Reclamation Areas Served by Outfall 005, 006, 007, 008, 009A, 009B and 010. <br />The Sediment Control Plan requirements in Part I.B.3.b. of the permit apply to the reclamation areas at this facility. The permittee <br />shall prepare and submit a Sediment Control plan by July 1, 2009. The Division will review the Sediment Control Plan and approve <br />it. Once approved by the Division, the Sediment Control Plan will become a part of this permit certification by reference. <br />Compliance Schedule for Sediment Control Plan for Reclamation Areas <br />Code 12505 A Sediment Control Plan shall be prepared and submitted by July 1, 2009 for the Reclamation Areas as required under <br />Part I.13.3.b. of the CDPS General Permit for Coal Mining Facilities and 40 CFR 434.82. The plan required by this compliance <br />schedule shall be directed to the Industrial Unit of the Permits Section for final review. <br />Code tt`? <br />x , i" ` <br />Description <br />r- t Gitalh#irue Date <br />Permtt <br />12505 Submit Plan Submit Sediment Control Plan Part LB.3.b. 07101109 <br />Other Conditions <br />Antide radation <br />Antidegradation review does not apply to this permit because the receiving stream is classified as Use Protected. <br />Total Maximum Daily Loads / 303(d) Listings <br />Segment 04 and the main stem of the Purgatoire River are on the 303(d) list as impaired for selenium with a designation of a Low <br />priority. A TMDL has not yet been developed or finalized, and therefore waste load allocations have not been made for this <br />parameter. At such time as a TMDL is complete, this certification may be reopened, and limitations and or monitoring requirements <br />may be added. Until such time, monitoring and reporting of this parameter will be required.
The URL can be used to link to this page
Your browser does not support the video tag.