2010-01-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-01-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:24 PM
Creation date
1/12/2010 2:49:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/11/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: 12/6/09 and 12/13/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame& <br />E.-rSS *?nvircnrrrsiAa <br />approximately 300 to 375 feet left of centerline using three track mounted drill rigs. <br />Blasting was performed in these areas Thursday (12/17/2009) and Friday (12/18/2009). <br />G) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Process. A CAT D-8 <br />dozer, a CAT 320 excavator, and a CAT 966 front-end loader were used to process the material. <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />So Cresson Clay Processing 5,159 150,273 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 5,159 182,181 <br />Soil liner fill processing totals not received from Ames for week ending 12/19/2009. <br />H) ADR and Crusher Waterlines <br />Hydrostatic testing of the 10" HDPE ADR waterline (station A24+00 (+/-) to the new ADR water <br />tank) was performed. The line was pressurized to 180 psi (1.5 x operating pressure) and held the <br />pressure for one hour. This meets the CEntry project specification. The testing was performed <br />under the observation of an AMEC field representative. <br />Construction of the ADR tank overflow line was finished. Trench excavation was performed using <br />a CAT 330 excavator. Pipe bedding placement was also performed as the trench excavation <br />progressed. This was performed using a CAT 966 front-end loader and a CAT 330 excavator. <br />Approximately 180 linear feet of trench was excavated and bedded. Approximately 180 linear feet <br />of 18-inch CPe was installed using a CAT 966 front-end loader for pipe delivery. The pipe was <br />coupled and backfilled using pipe bedding material. Pipe bedding material was compacted using a <br />CAT 330 excavator bucket. Approximately 180 linear feet of trench was backfilled. <br />Preparations for ADR waterline tie-ins were performed throughout the week. <br />I) Miscellaneous <br />No work performed during the week. <br />III) Underground Workings <br />A) Drilling <br />Confirmation drilling was finished at Underground workings #3006 and #3007. Twenty-two holes <br />were drilled on the northwest side of the workings, defining the limits of the loose material <br />previously encountered. A total of 1100 feet was drilled, encountering no voids. The drill holes <br />were surveyed by Ames' survey. The survey information will be sent to John Lupo and a <br />remediation plan will be submitted. <br />Confirmation drilling was finished at Underground working #3009. Five holes were drilled around <br />the center of the working and no voids were encountered. A total of 250 feet was drilled, <br />encountering no voids. The drill holes were surveyed by Ames' survey. The survey information <br />will be sent to John Lupo and a remediation plan will be submitted. <br />VLF Weekly Report WE 12.19.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.