Laserfiche WebLink
Table E-2 Mining and Reclamation Timetable <br />Task # Description Time Needed <br />(Months) <br />1 Prepare sediment pond and construct berm along <br />Ana branch 0.5 <br />2 Strip topsoil and overburden from phase 1. 1.0 <br />3 Mine phase 1. 13.2 <br />4 Mine phase 2 and reclaim phase 1. 15.8 <br />5 . Mine phase 3 and reclaim phase 2. 16.8 <br />13 Reclaim phase 3 and the sediment pond. 2.0 <br /> Total months 49.25 <br /> Total years 4.10 <br />5. Revegetation Plan <br />The dry flatland and slope areas will be harrowed and drill seeded with a mix consisting of the <br />following in order to control erosion: <br />Alkali Sacaton @ 0.5 lbs/acre <br />Indian Ricegrass @ 2.0 lbs/acre <br />Slender Wheatgrass @ 6.5 lbs/acre <br />Western Wheatgrass @ 7.5 lbs/acre <br />They will prevent erosion and provide forage and cover for animals. Certified weed free hay or <br />straw mulch will also be applied at the rate of 2000 lbs/acre. <br />The topsoiled slopes of the lake designated for wetlands will be broadcast seeded or hydro- <br />seeded for a distance 5 feet below waterline and 10 feet above waterline with the following mix: <br />Gehrman Pit October 09 E-3