Laserfiche WebLink
(f) Reclamation Costs: With Concurrent Reclamation at the site, the final site <br />reclamation area will be located in the equipment and buffer areas of 2.0 acres <br />or less (excavation area, concurrently reclaimed, being approximately 6.20 <br />acres total). Generally, by that date, all overburden and topsoil will have been <br />replaced and seeded and a pond of less than 2 acres will be established. The <br />water level of the pond will have season fluctuations and may be affected by <br />pond levels in the adjacent Gravel Pits. Final slopes will have already been <br />graded up the access gate area. Due to concurrent reclamation at the site, it is <br />estimated that less than three (3) days will be required for the final <br />reclamation of the site. Most reclamation at the site will be the final grading, <br />seedbed prep and seeding of the upper slope and buffer zone areas around the <br />site perimeter. Approximately 30 hours of grading, tilling and seeding time <br />will be required to complete the final reclamation of the site. <br />Estimate for final reclamation costs are as follows: <br />Bulldozer (D-6 incl. Mob) - 5 hours @ 125/hour = $625.00 <br />Tractor (with disc) - 10 hours @ 95/hour = $ 950.00 <br />Tractor (with seed drill) - 10 hours @ 90/hour = $ 900.00 <br />Seed Mix - 21.8 PLS for 2.0 acres= $ 400.00 <br />4 ton Straw Mulch - applied/crimped 250/ton = $ 1000.00 <br />Total estimated reclamation cost (2.Oacres) = $ 3872.00 <br />This cost estimate includes fuel, mobilization, operator and associated labor.