Laserfiche WebLink
The report includes 39 color photographs of the underdrain system. The photographs <br />provide substantial detail of the underdrain system before and during construction. A <br />height measurement is provided in the photographs to provide a scale for the size of the <br />material being placed in the underdrain system. <br />No problems or maintenance items were noted during the inspection of the Horse Gulch Excess Spoil <br />Fill. <br />Please note that according to Section 4.09.1(11)(a), certified reports are required during the following <br />construction periods: (1) removal of all organic material and topsoil, (2) placement of underdrain <br />systems, (3) installation of surface drainage systems, (4) placement and compaction of fill materials, <br />and (5) revegetation. If any of the above mentioned critical construction periods do occur please not <br />that additional reports are required. <br />If you have any questions feel free to contact me. (303) 866-3567 ext 8134 <br />Sincerely, <br />Jason ick <br />Environmental Protection Specialist