Laserfiche WebLink
Table 2 - Water Balance <br />Ready Mix Concrete Company <br />Lagged Depletions and Water Balance for the Morton Pit <br />Applegate <br />Group, Inc. <br /> Total <br /> <br />Consumptive <br /> <br />Use <br />Lagged <br /> <br />Depletions <br />Dewatenng <br /> <br />Credit Dewatering <br /> <br />Lagged <br /> <br />Depletions Brighton Ditch <br /> <br />Irrigation Season <br /> <br />Credit Brighton Ditch <br /> <br />Return Flow <br /> <br />Obligations Net Accretions <br /> <br />(+) / Depletions <br /> <br />(-) <br />Required Lease <br /> <br />Volume <br /> A, B C D E F (G) (H) <br />Jan-11 0.00 0.00 0.00 0.00 - - 0.00 0.00 <br />Feb-11 0.00 0.00 0.00 0.00 - - 0.00 0.00 <br />Mar-11 0.00 0.00 0.00 0.00 - - 0.00 0.00 <br />Apr-11 0.00 0.00 0.00 0.00 - - 0.00 0.00 <br />May-11 0.00 0.00 0.00 0.00 - - 0.00 0.00 <br />Jun-11 0.00 0.00 0.00 0.00 - - 0.00 0.00 <br />Jul-11 2.11 1.42 45.67 30.61 6.08 19.72 0.00 <br />Aug-11 2.01 1.71 9.13 13.97 4.91 -1.64 1.64 <br />Sep-11 1.80 1.62 8.84 9.07 2.78 0.93 0.00 <br />Oct-11 1.66 1.55 9.13 8.94 0.79 -0.57 0.57 <br />Nov-11 1.35 1.32 8.84 8.57 0.62 -1.68 1.68 <br />Dec-11 <br /> <br />r <br />l 0.99 <br />ow 1.05 <br />1 9.13 <br />=1 8.86 <br />00 <br />i 0.41 <br />w,- l -1.19 <br />aw 1.19 <br />(A) Total evaporation and operational losses from Table 1 <br />(B) Lagged depletions using Glover method in Appendix A <br />(C) Credit based on dewatering schedule of 2,000 gpm in Jul-11 and 200 gpm the remainder of the year <br />(D) Lagged depletions using Glover method in Appendix B <br />(E) Credit approved in previous SEO SWSP approval letter dated March 27, 2008 <br />(F) Return flows approved in previous SEO SWSP approval dated March 27, 2008 1m <br />17 <br />- <br />(G) Columns (C + E - B - D - F) 0M; 7 m <br />(H) -Depletions in Column (G) °z? a-A 0 <br /> oy'o <br />zC ? <br /> M <br /> <br />N:105142 Holton\Water RlphtslSWSP 2010.201 Molten SWSP Tables 2010-2011 DRAFr.xls 'm <br />m <br />0