Laserfiche WebLink
Ms. Sira Sartori <br />January 4, 2010 <br />Page 6 <br />case or any other legal action that may be initiated concerning this plan. This decision shall not <br />bind the state engineer to act in a similar. manner in any other applications involving other plans, <br />or in any proposed renewal of this plan, and shall not imply concurrence with any findings of fact <br />or conclusions of law contained herein, or with the engineering methodologies used by the <br />Applicant. <br />If you have any questions concerning this approval, please contact loana Comaniciu in <br />Denver at (303) 866-3581 or Dave Nettles in Greeley at (970) 352-8712. <br />Sincerely <br />Kevin G. Rein, P.E. <br />Assistant State Engineer <br />Attachments: Table 2 <br />Cc: Dave Nettles, Assistant Division Engineer (810 9th Street, 2nd Floor, Greeley, Colorado 80631, <br />970-352-8712) <br />Scott Edgar, Water Commissioner District 2 (1735 Dolores River Dr., Windsor, Co 80550, (970) <br />381-0828) <br />Division of Reclamation Mining and Safety <br />KGR/IDC/10-11/Ready Mixed Combined Plan (Holton Pit-M07-008 and Morton Lakes Pit-M08-082)