My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-08_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2010-01-08_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:58:27 PM
Creation date
1/11/2010 8:28:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
1/8/2010
Doc Name
Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
TR66
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C-1996-083 <br />TGnhninol Rcvicinn RR <br />PROJECT IDENTIFICATION <br />Date : 08-Jan-09 Permit C-1996-083 Site: Bowie No. 2 M ine <br />User: JRS State : Colorado <br /> Filename: C083-220 County: Delta <br />Agency Name: Colorado Division Of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 66 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />221 Plug and Seal Terror Creek Vent Shaft 160.00 $154,417 <br />222 Demolish and Remove all Structures at Terror Creek Vent Shaft 40.00 $10,436 <br />223 Regrade Terror Creek Vent Shaft Pad 4.40 $887 <br />224 Replace Topsoil from Stockpile to Terror Creek Vent Shaft Pad 2.32 $468 <br />225 Reseed Terror Creek Vent Shaft Pad 1.00 $802 <br /> <br /> <br /> <br /> Direct Cost Total 207.72 $167,010 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $3,374 <br /> Performance Bond (1.05% of Direct Costs) $1,754 <br /> Job Superintendent (at $52.10/hour) 103.86 $5,411 <br /> Profit (10.00% of Direct Costs) $16,701 <br /> Total Overhead and Profit $27,239 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $194,249 <br /> <br /> Legal - Engineering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $8,256 <br /> Reclamation Management and Administration (3.25% of Contract) $6,313 <br /> <br /> <br /> <br /> <br /> TOTAL TR-65 LIABILITY AMOUNT $208,818 <br />jrs Page 1 08-01-10
The URL can be used to link to this page
Your browser does not support the video tag.