Laserfiche WebLink
CC&V has reviewed these two minor changes for impacts to the financial warranty. An <br />engineering analysis of the final proposed configurations of the reclaimed surfaces <br />indicates that there will be less material to grade, and therefore the amount of work to <br />achieve final reclamation is not substantially changed. Similarly, since the temporary <br />access road will traverse through already disturbed areas, financial warranty has <br />already been posted for its footprint. <br />The financial warranty as approved for Amendment No. 9 does not need to be modified. <br />A check in the amount of $1,006 for this technical revision request is attached. <br />Please contact me at (719)-689-4055 should you have questions or wish to discuss this <br />request for a technical revision. <br />Sincerely, <br />,- F <br />1 t WV14 l? <br />Timm Comer <br />Manager, Environmental Resources <br />xc: Paul Clarkson, Director, Teller County Planning Department <br />Byron Hake, Mayor, City of Victor <br />Enclosed: Updated drawings C-4, C-5, and F-1 (3 copies)