Laserfiche WebLink
10/17/2009 07:48 19704543039 tWtlatN I """ "y <br />C L <br />Z3 <br />Cost estimate for the final pond configuration. <br />1. Cut keyway ...................... 4,200 if <br />2. Place 15 ft liner ........... 342,000 Cy <br />3. Dress slopes ............... 81,000 SY <br />4. Place Top Soil ............ 5,00OCY <br />at $1.00/lf <br />at $1.10/Cy <br />at $0.50/SY <br />at $2.00/CY <br />$4,200.00 <br />$374,000.00 <br />$40,500.00 <br />$10,000.00 <br />5. Seed ............................ 9.500SY at $0.50/SY $4,750.00 <br />Total $433,450.00 <br />