Laserfiche WebLink
4. Please bring the discussion of the mine plan found on revised page 2.05-13 into agreement with the <br />mining that occurred. TCC did not mine NMD Panel 25-Right, but mined through Panel 24-Right in <br />the NMD. Maps provided by TCC show that 8MN extended approximately 1200 feet north, not 3000 <br />feet as stated in the text. The Division believes that references to WMD panel 18-Left should be <br />corrected to 'panel 19-Left ". This revision proposes panel 19-Left to be approximately 800 feet in <br />width, not 1000 feet as stated on page 2.05-13. Please correct these references. Somewhere in this <br />mine plan discussion, it would be logical to note that the 18-Right Ventilation shaft was sealed in <br />November 2009. <br />Response: The referenced text has been reviewed and updated to reflect the actual mining and related <br />operations that have occurred. Copies of the revised text pages accompany these responses for <br />replacement in the PAP document.