Laserfiche WebLink
Processing Waste <br />The face of the waste pile at King I appeared in good shape, although snow cover limited inspection. <br />The operator's representative explained that the face was seeded before snow fall. <br />Support Facilities <br />King I - There was no activity at King I other than at the office. Fuel tanks in the surface facilities <br />area showed no signs of leaks or spills, and have adequate spill barriers in place. <br />King II - Earthwork for the surface facilities area of this new mine began in March 2007. Most of the <br />surface earthwork (roads, ditches, etc.) has been completed. Buildings in the office/bathhouse <br />/warehouse area remain under construction. Four portals have been developed at King II. Several <br />loads of coal were hauled away in tractor-trailer rigs during the inspection. The truck-scale area was in <br />full operation. <br />General Mine Plan Compliance <br />The operator appeared to be in compliance with the mine plan. <br />Photo 1- King I. Surface facilities area. <br />4